ARKEMA – Mont (FR)
.
Project : Carriage unloading and CDA storage
CDA supply route change for the Lactame production workshop in Mont plant :
. Setting up of new railways to convey CDA carriage on the plant (specific engineering)
. Setting up of a heating station and of 3 unloading arms for CDA carriage. Access to the carriage dome and transfer to CDA storage tanks through insulated and electric traced pipes,
. Setting up of a 235 m3 storage tank on a new location, to increase the plant’s CDA autonomy,
. Setting up of a pipe rack,
. Addition of electric connection in the exisiting substation,
. 20 m² extension of the South side control room
Assignments :
. All trades basic studies with project cost estimation
. All trades detailed studies and consultation files for technical packs,
. VISA and assistance for work construction orders
INGENICA thanks ARKEMA for its trust.