On 23 November 2018, at its site « La Vallee », near Le Puy en Velay , the executive management of FAREVA Group inaugurated its new workshop « HPAPI » with all those involved in the project.

Key to the project’s success was the good working relationship between FAREVA and INGENICA. Our projects assigned :

  • Architect services and the PC dossier 
  • Building and structures studies
  • HVAC studies
  • Pipe Studies
  • 3D synthesis modeling (PDMS) throughout the project
  • Assistance to supervise work on certain lots

 

Project key figures :

  • CAPEX : 27M€
  • Beginning of studies : june 2016
  • Inauguration : november 2018

 

Project perimeter :

  • HIGH POTENT OEB4&5 Production building
  • Storage park
  • Distribution racks and linking to existing ones

At the same time, INGENICA has been assigned project management of the extension of 2
laboratory areas (1 R&D area, 1 Quality Control area)

 

Project key figures :

  • CAPEX : 1.7M€
  • Beginning of studies : june 2016
  • Provision : december 2017

Therefore, INGENICA confirms its leadership in Chemical & Life Sciences. We thank
FAREVA for trusting us and its kind permission on the use of these references.