Confidential Client & Project – Europe
Les enjeux du projet: Development of a new e-fuel plant initiated by a consortium of European companies
. Project based on a CO2 capturing process to be introducted in a co-electrolysis reaction combined with a Fischer-Tropsch reaction, and a distillation unit to succeed in producing purified hydrocarbon products (diesel oil, fuel oil and waxes).
. Feasability study to define distillation process for the future industrial demonstrator pilot plant PtL (Power-to-Liquid). CAPEX ~10M€ for the pilot distillation unit.
. Feasability study for the thermal integration of the Fischer-Tropsch reaction process loops
Assignments : Feasability study of the distillation and unit and storage facilities
Process studies:
. Simulation of the distillation process (using Aspen software)
. PFD, PID,
. Lists of fluids/lines/equipment
. Pre-sizing of process equipment
. Pre-arrangement
. CAPEX estimate
Feasability studies of FT thermal loops integration